- 1. Executive Summary
- 1.1. Recommendation on the project and its eligibility
- 1.2. Summary of borrower’s background information
- 1.3. Summary of expected project benefits
- 1.4. Summary of project background
- 1.5. Results of project cash flow analysis (feasibility)
- 1.6. Financing plan
- 1.7. Assessment of Impact of Project on Energy Balance of Bulgaria
- 2. Project Background
- 2.1. Project base line and problem identification
- 2.2. Description of recommended technical measures
- 2.3. Project investments
- 2.3.1. Base project investments (design, equipment, installation
and working capital)
- 2.3.2. Other project investments (contingency, interest
paid during construction, principal paid during construction,
VAT, duties)
- 2.4. Project cash-flows
- 2.4.1. Operational costs breakdown (for all projects)
- 2.4.2. Revenues such as energy and other cost savings, revenues
from energy sales, Carbon Credits
- 2.5 Activity Based Schedule (ABS) (incl. inter-alia a plan for
obtaining the necessary permissions, permits and licenses)
- 2.6 Completion Validation Review (CVR) check-list
- 3. Financing Plan
- 3.1. Type and amount of finance required
- 3.2. Proposed financial schemes including the project sponsor’s
contribution
- 3.3. Proposed terms and conditions of finance (loan currency,
grace period, maturity, interest rate, other bank’s fees)
- 3.4. Specific sub-loan under EBRD’s Credit Line from the Participating
Bank (terms and conditions)
- 4. Project Cash Flow Analysis
- 4.1. Project cash flow statements
- 4.2. Project Cash flow analysis
- 4.2.1. Statements for cash flow analysis (net cash flow,
discounted net cash flow, cumulative cash flow)
- 4.2.2. Capital Investment Decision Indicators (financial
IRR, NPV, payback period)
- 4.2.3 Projected Cash Flow Including CO2 Emission Reduction
Sales
- 5. Other Project Benefits
- 5.1. Greenhouse gas emission reduction against the baseline
without the project (following a similar method as for Joint-Implementation
projects)
-
5.2. Other environmental improvements (incl. inter-alia
reduced emissions of NOx, SOx, dust, waste and waste water)
- 5.3. Productivity improvements
- 5.4. Other benefits (inter-alia and not limited to reduced
maintenance, social impact, improvement safety and work hygiene)
- 6. Compliance with Environmental, Health and Safety Standards
- 6.1. Compliance with National Environmental Standards and
with Habitats and Wild Birds Directive
- 6.2. Compliance with National Health, Safety and Fire-Precaution
Standards
- APPENDIX A. IMPLEMENTATION COSTS AND PROJECT SCHEDULE
- APPENDIX B. MONTHLY CASH FLOW AND LONG-TERM DEBT
- APPENDIX C. FINANCIAL STATEMENTS, OFFERS AND CONTRACTS FOR PROJECT
IMPLEMENTATION